Is the proposed site where the nuclear power station was?

No. The proposed site is the land to the north of the former nuclear power station.

Isn’t Chapelcross a brownfield site?

No. The proposed site of the data centre is 60% greenfield land. The 40% brownfield land is the site of the former RAF airfield, an area which the scoping reports says ‘supports some of the best examples of species rich grassland in the region’.

Won’t the development create jobs for local people?

Some jobs would be created, but how many is uncertain. There is no information provided on which company would operate the data centres once they're built, and the developer has not disclosed what tools or methodology they used to produce their job creation estimates.

How many jobs do AI data centres create?

According to a report by Action to Protect Rural Scotland (APRS), 
20-50 operational on-site jobs is typical.

How much energy would the data centre campus consume?

At 1,000MW, the data centre would use over 7 million MWh of electricity per year.

That is equivalent to:

  • 25% of Scotland’s peak power demand
  • 2,231,847 households (88% of households in Scotland)
  • 23% of all wind energy production in Scotland in 2024 (onshore plus offshore)
  • 10 times Dumfries & Galloway's current energy use (0.7 million MWh per year)
  • More than double Dumfries & Galloway's current energy generation (2.9 million MWh per year)

Would the data centre’s energy consumption have effects on local people?

Yes. Areas with hyperscale data centres in America have experienced more frequent blackouts due to stress placed on the energy grid. In Ireland, households have seen their electric bills rise by over €300.

Wouldn't the development be net-zero?

No. Operation of the data centre is expected to produce 432,031 tonnes of carbon dioxide each year.

The Planning Statement states: "Set against the Scottish carbon budgets, the emissions of the Proposed Development represent 1.05% of the budget for the period 2026 to 2030, 3.06% for 2031 to 2035, 3.15% for 2036 to 2040 and 9.76% for 2041 to 2045."

The developer claims that only renewable energy will be used and in a recent interview with Sky News states that the site would only use energy "from wind farms backed up by battery energy storage systems". However, the entire region of Dumfries & Galloway produced about 2.1 million MWh of wind energy in 2025. So D&G would have to triple it's wind energy production to supply just this facility. The largest operational battery energy storage system (BESS) in Scotland (and all of Europe) is "Coalburn 1" which has a 1 GWh, so would only be able to power this facility for one hour if discharging fully.

In reality, the existing wind energy and battery storage are already being used to supply our current electricity grid and demand, so new additional energy systems would be required. Evidence from the US and Ireland which have led in building hyperscale data centres is that variable renewable energy is not sufficient to power these data centres, and the large additional, constant baseload on the electricity grid is mostly met by running fossil fuel power stations e.g. gas-fired power stations. This causes a large increase in both carbon emissions and energy bills due to the high price of gas.

How much noise would the data centre produce?

AI data centres produce high levels of low-frequency noise, which has not been assessed in the Environmental Impact Assessment (EIA). Low-frequency noise has caused serious disturbances and illnesses for people living near AI data centres, yet no information is provided on how much would be produced by the proposed Chapelcross development.

Mid-frequency noise, which has been assessed, would still have an adverse effect. Houses nearest the site would be exposed to nighttime sound levels of 40-45 dB(A), and Creca would be exposed to sound levels of 35-40 dB(A). The WHO guidelines for community noise recommend less than 30 A-weighted decibels (dB(A)) in bedrooms during the night for a sleep of good quality and less than 35 dB(A) in classrooms to allow good teaching and learning conditions. The WHO guidelines for night noise recommend less than 40 dB(A) of annual average (Lnight) outside of bedrooms to prevent adverse health effects from night noise.

What are the health effects of low-frequency noise?

Long-term exposure to low-frequency noise has been associated with sleep disorders, discomfort, dizziness, sensitivity to and irritability from noise, annoyance, hearing loss, and cardiovascular diseases.

Do CX Tech have guaranteed grid connections?

The planning application does not state where the additional energy required to power the facility would come from. It also fails to acknowledge the need for a massive increase to the local grid capacity (generation, cables, pylons, transformers, etc.) that would need to be built to accommodate the facility's energy demand. These would be significant and require their own planning applications - and there is no guarantee that planning permissions would be granted, or that Scottish Power Energy Networks (SPEN) have the ability to expand the regional network capacity in the time required to match the massive demand from the data centre. It should be noted that grid operators are already struggling to expand the grid to connect existing renewable energy developments that are already in the planning process pipeline to existing demand to meet government "Clean Power 2030" targets. So adding an additional demand that would require grid capacity to double or triple would appear incredibly difficult to deliver and needs to be properly assessed and agreed before progressing the data centre plans further.

Where would the energy come from?

As detailed in the sections above:

  • A 1 GW data centre could consume about 7 TWh per year of energy
  • Dumfries & Galloway currently consumes about 0.7 TWh per year of energy
  • Dumfries & Galloway currently generates about 2.9 TWh per year of energy
  • The excess energy (about 2.2 TWh per year) is exported to meet demand elsewhere on the national grid

It is clear that it is impossible to supply the energy demand from the data centre without building additional energy generation and power network capacity.

If no additional energy generation is built to supply this data centre, then just 4 of the buildings (of this 8 building campus) would consume all of D&G's current generation capacity, with no energy left over for export or to meet the energy demand of D&G's citizens.

The Chapelcross developers (CX Technology) have not specified in their planning application where the additional energy generation would be supplied from.

How many back-up generators would the site require and what fuel would they use?

The planning documents specify 42 back-up generators per building, which amounts to 336 generators in total for all 8 buildings. The generators would likely run on diesel. This would most likely be produced from fossil fuel. The developers claim that Hydrotreated Vegetable Oil (HVO) bio-diesel could be used - see following section.

What is Hydrotreated Vegetable Oil (HVO)?

HVO is bio-diesel made from waste biomass, usually 'used cooking oil'. This is often collected from large fast food outlets (think waste oil from chip fryers). However, this feedstock is already fully utilised to produce bio-diesel for road transport and bio-kerosene (jet fuel) for aircraft. There is only enough feedstock to produce a few % of the supply for these uses. Europe already collects most of it's used cooking oil, and as a result imports the majority (80%) of it's supply from South East Asia: e.g. China and Malaysia. These countries export more 'used cooking oil' than they can feasibly collect, which has lead to serious concerns that virgin palm oil is being fraudulently labelled and sold which is driving deforestation and negative biodiversity and climate impacts.

What kind of emissions would be produced at the site?

Regardless of the fuel type, diesel generators produce significant noise, carbon, NOx and air pollution (ultrafine particles etc.) when they run. Of significant importance is the carbon emissions associated with the electricity use of the site, which would likely be produced off-site, e.g. by gas-fired power stations running somewhere else on the grid to balance the demand. CO2 emissions related to the energy generation – assuming most recent carbon intensity of energy figures – for a 1 GW / 1000 MW facility would be 1,240,416 tonnes of CO2 per year.

How would the backup generators affect air quality?

CX Tech's modelling predicts substantial short-term nitrogen dioxide (NOx) increases during generator operation, producing 5x the current level of air pollution in the area. Ultrafine particles which are damaging to human health and can enter the bloodstream to cause a variety of health conditions would also be emitted.

 